Road closures

For more information on regional road closures visit New Zealand Transport Agency.


Approved
19 Apr 2021 — 30 Jul 2021

Temporary Road Closure - Konini Street/Gloucester Street

Applicant: Ching Contracting Ltd

Location: Konini Street – from Kerr Street to #77 Konini Street

Gloucester Street - from Vanguard Street to Kerr Street

Event: The closure is for a stormwater and watermain upgrade.

Date and time of closure: Monday 19 April to Friday 30 July 2021, Closed between 8.00am – 4.00pm

The proposal is for no vehicle access through the work site during the above times, ordinary traffic will be detoured.

Access will be provided for residents outside of working hours and during the day when it is safe to do so, there may be delays.

Pedestrian access past the work site will be kept open whenever possible, there may be delays.

Kerr Street traffic will be detoured to Hardy Street via Oxford Street.

Approved
17 May 2021 — 6 Aug 2021

Temporary Road Closure - Tosswill Road

Event: This closure is to allow for the construction of a new stormwater pipe under the road.
Location: Tosswill Road – from 32 Tosswill Road to 41 Tosswill Road
Date and Time of new closures:
There will be two stages of work:
Stage One – Complete
Stage Two – Stormwater pipe, sewer pipe and inlet structure

Date and time of closures: Stage Two - Tosswill/Chamberlain Roundabout to number 41
6am Monday 14 June to 6pm Tuesday 3 August 2021
Note: There will also be a period of stop/go as work progresses through the roundabout.

There will be no vehicle access through the work site during the above times, ordinary traffic will be detoured. Access will be provided for residents outside of working hours and during the day when it is safe to do so, which may result in delays. The contractor will liaise with residents living within the worksite and manage access to driveways with them.

Pedestrian traffic past the work site will be kept open during both stages of work, but people may have to wait until it is safe for them to walk through.

Approved
19 May 2021 — 6 Aug 2021

Temporary Road Closure - Tosswill Road

Event: This closure is to allow for the construction of a new stormwater pipe under the road.
Location: Tosswill Road – from 32 Tosswill Road to 41 Tosswill Road
Date and Time of new closures:
There will be two stages of work:
Stage One – Complete
Stage Two – Stormwater pipe, sewer pipe and inlet structure

Date and time of closures:
Stage Two - Tosswill/Chamberlain Roundabout to number 41
6am Monday 14 June to 6pm Tuesday 3 August 2021
Note: There will also be a period of stop/go as work progresses through the roundabout.

There will be no vehicle access through the work site during the above times, ordinary traffic will be detoured. Access will be provided for residents outside of working hours and during the day when it is safe to do so, which may result in delays. The contractor will liaise with residents living within the worksite and manage access to driveways with them.

Pedestrian traffic past the work site will be kept open during both stages of work, but people may have to wait until it is safe for them to walk through.

Approved
19 May 2021 — 6 Aug 2021

Temporary Road Closure - Tosswill Road

Event: This closure is to allow for the construction of a new stormwater pipe under the road.
Location: Tosswill Road – from 32 Tosswill Road to 41 Tosswill Road
Date and Time of new closures:
There will be two stages of work:
Stage One – Complete
Stage Two – Stormwater pipe, sewer pipe and inlet structure

Date and time of closures:
Stage Two - Tosswill/Chamberlain Roundabout to number 41
6am Monday 14 June to 6pm Tuesday 3 August 2021
Note: There will also be a period of stop/go as work progresses through the roundabout.

There will be no vehicle access through the work site during the above times, ordinary traffic will be detoured. Access will be provided for residents outside of working hours and during the day when it is safe to do so, which may result in delays. The contractor will liaise with residents living within the worksite and manage access to driveways with them.

Pedestrian traffic past the work site will be kept open during both stages of work, but people may have to wait until it is safe for them to walk through.

Approved
28 Jul 2021 — 30 Jul 2021

Temporary Road Closure - Brook Street and Sugar Loaf Place

Applicant: Nelson Marlborough Traffic Management
Location: Brook Street (between number 321 and number 385) and Sugar Loaf Place
Date and time of scheduled closure: Wednesday 28 July – Friday 30 July 2021. Closed between 9:00am – 3:00pm.
Wet Weather Date: Monday 2 August – Wednesday 4 August 2021. Closed between 9:00am – 3:00pm.
Event: The closure is for the felling of dangerous trees on the roadside.
The road will be open on the hour, every hour (e.g. 10:00 am, 11:00 am etc), to allow traffic through when safe and directed by the contractor. The road will be closed to all traffic (except for emergency vehicles) between those times.

Proposed
29 Jul 2021 — 4 Aug 2021

Temporary Road Closure - Enner Glynn Road

Applicant: Higgins
Location: Enner Glynn Road – between The Ridgeway and Newman Drive
Date and time of scheduled closure: Thursday 29 July to Friday 30 July 2021. Closed between 7:00am – 5:00pm
Wet Weather Date: Monday 2 August to Wednesday 4 August 2021. Closed between 7:00am – 5:00pm. 
Event: The closure is for levelling of the road before resealing.
Resident access (including the Play Centre) will be available when safe, and directed by the contractor. There may be delays for those within the closure area.

Proposed
2 Aug 2021 — 13 Sep 2021

Temporary Road Closure - Wellington Street

Applicant: Higgins

Location: Wellington Street – between number 35 to number 48

Date and time of scheduled closure: Monday 2 August to Friday 13 August 2021. Closed all day and all night

Wet Weather Date: Thursday 9 September to Monday 13 September 2021. Closed all day and all night

Event: The closure is for the repair of the footpath boardwalk. Wooden slats need to be replaced. A temporary footpath will be provided along the road during this time.

Where possible, the road will be open in one direction afterhours. The contractor would confirm the direction of travel in a follow-up letter drop should this closure be approved. If unable to open one lane, the road will remain closed all day and all night whilst structural work is undertaken to the boardwalk. In this event, residents will be required to gain access from either Konini Street or Rutherford Street depending on which side of the closure you live.

Proposed
2 Aug 2021 — 8 Oct 2021

Temporary Road Closure - Milton Street

Applicant: Higgins

Location: Milton Street – between number 114 and number 134

Date and time of scheduled closure: Monday 2 August to Wednesday 29 September 2021. Closed all day and all night 

Wet Weather Date: Monday 27 September to Friday 8 October 2021. Closed all day and all night 

Event: The closure is for the installation of stormwater pipework, kerbing and footpath replacement.

Resident access will be available when safe to do so (for those residents within the closure area).

Proposed
28 Aug 2021

Temporary Road Closure - Church Street

Applicant: Nelson City Council   

Location: Church Street

Event: The closure is for a Youth Lane Event – in collaboration with the 4 Lanes Festival

Date and time of scheduled closure: Saturday 28 August 2021.  Closed between 1.00pm and 12.00am

The road will be closed and vehicle access will be unavailable during this time.

Proposed
29 Oct 2021 — 30 Oct 2021

Temporary Road Closure - Nelson Arts Festival 2021

Applicant: Nelson Arts Festival 2021

Location: CBD Roads - Morrison Street including Morrison Square, Part closure of Montgomery Square Carpark, Entrance to Montgomery Square Car Park from Bridge Street and Hardy Street, Trafalgar Street from Bank Lane to Hardy Street, Park Street, Hope Street, Church Street, Hardy Street from Montgomery Square Carpark to Collingwood Street, Trafalgar Square, Selwyn Place from Trafalgar Square to Sussex Street

Event: Nelson Arts Festival – Mask Parade and Carnival 2021

Date and time of closure: 9:00 am Friday 29 October to 3:00 am Saturday 30 October 2021.  Specific roads have different start and end times.  View website for further details.

 

The roads will be closed and vehicle access will be unavailable during this time.