Road closures
Temporary Road Closure - Hastings Street
Applicant: Tasman Civil
Locations: Hastings Street
Date and time of scheduled closure: 7:00 am Tuesday 18 January to 8:00 pm Wednesday 31 May 2023. Closed all day and all night.
The closure is for a stormwater upgrade.
There will be no on-street parking permitted during the closure but there will be some limited parking provided for residents in Pioneer park.
Vehicle access to the properties will be maintained except while works are directly outside properties.
Pedestrian access to the properties will be provided at all times for residents.
The footpath on Washington Road will be closed but pedestrians will be detoured using pathways in Pioneer Park.
Couriers and home help will need to use the limited parking provided at Pioneer Park while there is no access.
Rubbish bins are to be placed outside properties by 7:00 am as usual. We will make provisions to assist the collectors with picking them up and returning them to the properties.
Temporary Road Closure - Pioneer Crescent
Applicant: Tasman Civil
Locations: Pioneer Crescent
Date and time of scheduled closure: 7:00 am Monday 14 February to 8:00 pm Wednesday 31 May 2023. Closed all day and all night.
The closure is for a stormwater upgrade.
Note: Hastings Street will remain closed for the same duration listed above (as previously advertised and approved)
There will be no on-street parking permitted during the closure but there will be some limited parking provided for residents in Pioneer Park.
Vehicle access to the properties will be maintained except while works are in the Pioneer/Hastings intersection.
Pedestrian access to the properties will be provided at all times for residents.
The footpath on Washington Road will be closed but pedestrians will be detoured using pathways in Pioneer Park.
Couriers and home help will need to use the limited parking provided at Pioneer Park while there is no access.
Rubbish bins are to be placed outside properties by 7:00 am as usual. We will make provisions to assist the collectors with picking them up and returning them to the properties.
Temporary Road Closure - Mako Street & Fullford Drive
Applicant: Downer
Event: Hill Street North Water Mains Project
Location: Mako Street and Fullford Drive exits onto Hill Street North
Date and time: 9.00am Monday 14 November 2022 to 6.00pm Sunday 15 February 2023. Closed between 7:00 am to 5:00 pm.
The roads will be open over the Christmas break from Thursday 22 December 2022 to Monday 9 January 2023.
Access into Mako Street and Fullford Drive will be from the other entrance.
Delays are likely. Vehicle access for residents, couriers and home help will be available where possible. Rubbish and recycling bins will be collected as normal.
Pedestrian access will be provided.
Temporary Road Closure - Scotland Street
Applicant: Asphalt & General
Event: Maintenance
Scotland Street – entire length
Date and time of scheduled closure: Monday 16 January to Friday 17 February 2023. Closed between 7:00 am to 4:30 pm daily.
The closure is for a new power cable.
Delays are likely. Vehicle access for residents, couriers and home help will be available at all times. Rubbish and recycling bins will be collected as normal.
Pedestrian access will be provided.
Temporary Road Closure - Rutherford Street and Van Diemen Street Intersection
Applicant: Fulton Hogan
Event: Following the installation of the major pipes and reopening of Waimea Road to traffic, work can now begin to put the Rutherford Street/Van Diemen Street intersection back to how it was.
This work will include improving drainage at the intersection, along with reinstating the road, kerbs and concrete islands.
Location: Rutherford Street and Van Diemen Street Intersection
Date and time of scheduled closure: Monday 16 January to Friday 10 February 2023. Closed all day and all night.
Vehicle access will be unavailable through the closed area.
Couriers and home help will need to use alternative routes. Pedestrian access will be available at all times.
Rubbish bins and recycling will be collected as normal.
Temporary Road Closure - Parkers Road, Awatea Place and Golf Road
Applicant: Hunter Civil
Event: Awatea Pump Station Project
Location: Parkers Road – Awatea Place - Golf Road
Date and time: Monday 16 January to Friday 24 February 2023. Closed between 7:00 am to 6:00 pm, Monday-Friday.
The closure is for the Awatea Place Wastewater Pump Station Project.
Work involves installing new wastewater pipes and manholes in the road.
Temporary Road Closure - Holcroft Place
Applicant: Fulton Hogan
Event: Maintenance
Location: Holcroft Place – Full length
Date and time of when the one-day closure may occur: Monday 23 January 2023. Closed between 7:00 am to 6:00 pm.
Contingency dates and times of when one-day closure may occur: Tuesday 24 January to Friday 3 February 2023. Closed daily between 7:00am and 6:00pm.
The closure is for resealing the road. Updates regarding when work will take place will be updated on shape.nelson.govt.nz.
Delays are likely. Vehicle access for residents, couriers and home help will be available where possible. Rubbish and recycling bins will be collected as normal.
Pedestrian access will be provided.
Temporary Road Closure - Sargeson Street, Glover Street and Baxter Street
Applicant: Fulton Hogan
Event: Maintenance
Location: Sargeson Street – full length
Glover Street – full length
Baxter Street – full length
Date and time of when the one-day closure may occur: Monday 23 January 2023. Closed between 7:00 am to 6:00 pm.
Contingency dates and times of when the one-day closure may occur: Tuesday 24 January to Friday 3 February 2023. Closed daily between 7:00am and 6:00pm.
The closure is for road levelling work. Updates regarding when work will take place will be updated on shape.nelson.govt.nz.
Delays are likely. Vehicle access for residents, couriers and home help will be available where possible. Rubbish and recycling bins will be collected as normal.
Pedestrian access will be provided.
Temporary Road Closure - Village Lane, Greenfield Lane and Waterson Lane
Applicant: Fulton Hogan
Event: Maintenance
Location: Village Lane – Full length
Greenfield Lane - Full length
Waterson Lane – Full length
Date and time of when the one-day closure may occur: Tuesday 24 January 2023. Closed between 7:00 am to 6:00 pm.
Contingency dates and times of when the one-day closure may occur: Wednesday 25 January to Friday 3 February 2023. Closed daily between 7:00am and 6:00pm.
The closure is for road levelling work. Updates regarding when work will take place will be updated on shape.nelson.govt.nz.
Delays are likely. Vehicle access for residents, couriers and home help will be available where possible. Rubbish and recycling bins will be collected as normal.
Pedestrian access will be provided.
Temporary Road Closure - Vickerman Street
Applicant: Fulton Hogan
Event: Maintenance
Location: Vickerman Street – from Rogers Street to the end
Date and time of when the weekend closure may occur: Saturday 28 January to Sunday 29 January 2023. Closed between 7:00 am to 6:00 pm.
Contingency dates and times of when the weekend closure may occur: Saturday 4 February to Sunday 5 February and Saturday 11 February to Sunday 12 February 2023. Closed daily between 7.00am and 6.00pm.
The closure is for road levelling work. Updates regarding when work will take place will be updated on shape.nelson.govt.nz.
Delays are likely. Vehicle access for residents, couriers and home help will be available where possible. Rubbish and recycling bins will be collected as normal.
Pedestrian access will be provided.